Emergency Support Team Restores Power to Hospital After Two Electrical Faults
When MultiCare Tacoma General Hospital lost power, several teams collaborated around the clock to assess, diagnose, repair, and bring systems back online safely.
When MultiCare Tacoma General Hospital lost power, several teams collaborated around the clock to assess, diagnose, repair, and bring systems back online safely.
Elevate your skills and mindset to be the technician that your company and customers will know they can depend on. Here’s how.
Follow best practices and processes to be efficient and confident in test results when working on medium-voltage cables.
NFPA 70B provides guidance for assessing equipment by its physical condition, criticality, and operating environment.
Though NFPA 70B made EMPs mandatory, it provides room for facilities to tailor a program that fits their needs and budget.
Perform routine inspections and testing of transformers to avoid downtime and catastrophic failures.
The latest version of NFPA 70B is designed to work in conjunction with NFPA 70 NEC for installation of electrical systems.
Wallace is an accomplished and tireless leader who will lead CBS Field Services into a new era of success.
As the electrical industry evolves, the IEC 61850 standard will play a critical role in shaping the future of power systems.
[...]