While on-site at a customer’s location performing preventive maintenance to the primary switch, our technicians came across a severely-burnt arc chute. This was caused by the arcing blade becoming stuck. The electrical current arced and burned a hole in the arc chute. CBS Field Services replaced the arc chute and serviced the switch.

FAQ-Image-1
FAQ-image-2

Primary switch at customer’s location blew up. The picture is of the copper bus in the primary switch. The insulation failed and burnt a hole to the copper bus piece. This resulted in the main breaker opening and causing loss of power to a third of the facility. Powertech repaired the insulation to the copper bus piece and reinstalled.